Run-of-the-river hydroelectricity

Run-of-the-river hydroelectricity (ROR) is a type of hydroelectric generation whereby a considerably smaller water storage called pondage or none is used to supply a power station. Run-of-the-river power plants are classified as with or without pondage. A plant without pondage has no storage and is, therefore, subjected to seasonal river flows and serves as a peaking power plant while a plant with pondage can regulate water flow and serve either as a peaking or base load power plant.

Contents

Concept

Run-of-the-river hydroelectricity is ideal for streams or rivers with a minimum dry weather flow or those regulated by a much larger dam and reservoir upstream.[1][2] A dam, smaller than that used for traditional hydro, is required to ensure that there is enough water to enter the "penstock" pipes that lead to the lower-elevation turbines.[3] Projects with pondage, as opposed to those without pondage, can store water for peak load demand or continuously for base load, especially during wet seasons.[1] In general, projects divert some or most of a river’s flow (up to 95% of mean annual discharge)[4] through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream.[3]

ROR projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydro dams store enormous quantities of water in reservoirs, necessitating the flooding of large tracts of land. In contrast, most run-of-river projects do not require a large impoundment of water, which is a key reason why such projects are often referred to as environmentally-friendly, or "green power."[5]

The use of the term "run-of-the-river" for power projects varies around the world and is dependent on different definitions. Some may consider a project ROR if power is produced with no storage while a limited storage is considered by others. Developers may mislabel a project ROR to sooth public image about its environmental or social effects. The Bureau of Indian Standards describes run-of-the-river hydroelectricity as:[6]

A power station utilizing the run of the river flows for generation of power with sufficient pondage for supplying water for meeting diurnal or weekly fluctuations of demand. In such stations, the normal course of the river is not materially altered.[6]

Many of the larger ROR projects have been designed to a scale and generating capacity rivaling some traditional hydro dams.[7] For example, one ROR project currently proposed in British Columbia (BC) Canada—one of the world’s new epicentres of run-of-river development—has been designed to generate 1027 megawatts capacity.[8]

Advantages

When developed with care to footprint size and location, ROR hydro projects can create sustainable energy minimizing impacts to the surrounding environment and nearby communities.[3] Advantages include:

Cleaner power, fewer greenhouse gases

Like all hydro-electric power, run-of-the-river hydro harnesses the natural energy of water and gravity, eliminating the need to burn coal or natural gas to generate the electricity needed by consumers and industry.

Less flooding/reservoirs

Substantial flooding of the upper part of the river is not required for smaller-scale run-of-river projects as a large reservoir is not required. As a result, people living at or near the river don't need to be relocated and natural habitats and productive farmlands are not wiped out.

Disadvantages

"Unfirm" power

Run-of-the-River power is considered an “unfirm” source of power: a run-of-the-river project has little or no capacity for energy storage[9] and hence can't co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power during times when seasonal river flows are high (i.e, spring freshet),[8] and much less during drier summer months. However, it is more predictable than solar PV or wind.

Availability of sites

The potential power at a site is a result of the head and flow of water. By damming a river, the head is available to generate power at the face of the dam. Where a dam may create a reservoir hundreds of kilometers long, in run of the river the head is usually delivered by a canal, pipe or tunnel constructed upstream of the power house. Due to the cost of upstream construction, a steep drop in the river is desirable.

Environmental impacts

Small, well-sited ROR projects can be developed with minimal environmental impacts. [3] Larger projects have more environmental concerns. For example, Plutonic Power Corp.’s Bute Inlet Hydroelectric Project in BC will see three clusters of run-of-river projects with 17 river diversions;[7] as proposed, this run-of-river project will divert over 90 kilometres of streams and rivers into tunnels and pipelines, requiring 443 km of new transmission line, 267 km of permanent roads, and 142 bridges, to be built in wilderness areas.[10]

British Columbia’s mountainous terrain and wealth of big rivers have made it a global testing ground for run-of-river technology. As of March 2010, there were 628 applications pending for new water licences solely for the purposes of power generation – representing more than 750 potential points of river diversion.[11]

Concerns

Many of the impacts of this technology are still not understood or well-considered, including the following:

Major examples

See also

References

  1. ^ a b Dwivedi, A.K. Raja, Amit Prakash Srivastava, Manish (2006). Power Plant Engineering. New Delhi: New Age International. p. 354. ISBN 8122418317. http://books.google.com/books?id=P-7kM_VZqxcC&pg=PA354&lpg=PA354&dq=run+of+the+river+pondage&source=bl&ots=ELkFHcBwbo&sig=uaNyjOsVInBPYKFG0DgXHd-qQWQ&hl=en&ei=0FhvTf_EO5T5cZv44PgC&sa=X&oi=book_result&ct=result&resnum=6&ved=0CDwQ6AEwBQ#v=onepage&q=run%20of%20the%20river%20pondage&f=false. 
  2. ^ Raghunath, H.M. (2009). Hydrology : principles, analysis, and design (Rev. 2nd ed. ed.). New Delhi: New Age International. p. 288. ISBN 8122418252. http://books.google.com/books?id=-N1G5VSoRngC&pg=PA288&lpg=PA288&dq=run+of+the+river+pondage&source=bl&ots=I_zh2RqWve&sig=BCxim0kXhEQBLXjXqPoufkpRJEU&hl=en&ei=0FhvTf_EO5T5cZv44PgC&sa=X&oi=book_result&ct=result&resnum=9&ved=0CE4Q6AEwCA#v=onepage&q=run%20of%20the%20river%20pondage&f=false. 
  3. ^ a b c d e f g Douglas T, Broomhall P, Orr C. (2007). Run-of-the-River Hydropower in BC: A Citizen’s Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects. Watershed Watch.
  4. ^ a b Knight Piesold Consulting. Plutonic Hydro Inc. Bute Inlet Project. Summary of Project Intake and Turbine Parameters. Knight Piesold Consulting.
  5. ^ Hydromax Energy Limited. Hydromax Energy Limited website.
  6. ^ a b Partha J. Das1, Neeraj Vagholikar. "Damming Northeast India". Kalpavriksh, Aaranyak and ActionAid India. p. 4-5. http://www.conflicts.indiawaterportal.org/sites/conflicts.indiawaterportal.org/files/Damming%20Northeast%20India,%20Single%20page%20format.pdf. Retrieved 11 July 2011. 
  7. ^ a b Plutonic Power (2008). Revised Project Description for Bute Inlet Hydroelectric Project Requirements. P1. Plutonic Power.
  8. ^ a b Wilderness Committee. Wilderness Committee Comments on the Draft Terms of Reference, Bute Inlet Hydroelectric Private Power Project. Letter to Kathy Eichenberger, Project Assistant Director. P1. Wilderness Committee.
  9. ^ Douglas, T. (2007). “Green” Hydro Power: Understanding Impacts, Approvals, and Sustainability of Run-of River Independent Power Projects in British Columbia. Watershed Watch.
  10. ^ "The Bute Inlet Hydroelectric Project, Backgrounder" (PDF). Watershed Watch Salmon Society. Watershed Watch. 2009. p. 2. http://www.watershed-watch.org/BACKGROUNDER-ButeInlet_Feb3.pdf. Retrieved 2010-08-03. 
  11. ^ a b c IPPwatch.com website. IPPwatch.com.
  12. ^ "The Bute Inlet Hydroelectric Project, Backgrounder" (PDF). Watershed Watch Salmon Society. Watershed Watch. 2009. p. 4. http://www.watershed-watch.org/BACKGROUNDER-ButeInlet_Feb3.pdf. Retrieved 2010-08-03. 
  13. ^ "BC Water Act". Legislation. http://www.bclaws.ca/EPLibraries/bclaws_new/document/ID/freeside/00_96483_01. Retrieved May 20, 2011. 
  14. ^ Hydro-Québec Production (2011), Hydroelectric Generating Stations (as of December 31, 2010), Hydro-Québec, http://www.hydroquebec.com/generation/centrale-hydroelectrique.html, retrieved 2011-05-17